§ 242-8. Fees.
Latest version.
-
The Bureau of Buildings shall make the charges as set forth in Chapter 133, Fees, for the following, after approval of plans by the Plumbing Inspector and filing of notification of plumbing to be installed:A.There shall be a fee for permit to proceed and inspection of a certificate of approval for six fixtures or waste-discharging outlets or fewer, and an additional fee for each additional fixture or waste-discharging outlet exceeding six.B.There shall be a fee for the replacement of fixtures and repairs and sewer cappings and the issuance of a certificate of approval therefor.C.There shall be a fee for inspection and testing of each gas piping system and issuance of a certificate of the same and on buildings wherein other plumbing is being done and filed for and where gas piping is being installed.Editor's Note: Amended during codification; see Ch. 1, General Provisions.
Amended 12-19-1995 by Ord. No. 274-1995