New Rochelle |
Code of Ordinances |
Appendix |
Chapter A361. Land Development |
Article III. Submissions Required for Subdivision Approval |
§ A361-13. Plat approval data.
Latest version.
-
The following documents shall be submitted to the Board for plat approval:A.Plat, legibly drawn in ink on tracing cloth, in sheets not exceeding 30 x 40 inches, and at a scale not smaller than 50 feet to the inch. When more than one sheet is required, an additional index sheet of the same size shall be filed showing to scale the entire subdivision with lot and block numbers. The plat shall show:(1)Subdivision name, date, North point, scale and the name of the City and county in which said subdivision is located.(2)Certification of title showing ownership, name, address and signature of record owner.(3)Names of owners and property lines of abutting land.(4)Seal and license number of a professional engineer or surveyor and his certification as to the accuracy of the survey and plat.(5)Primary control points, or descriptions and ties to said control points, to which all dimensions, angles, bearings and similar data on the plat shall be referred, as directed by the City Engineer, to enable the immediate determination of the location, bearing and length of every line shown on the plat and their reproduction upon the ground. When directed by the City Engineer, ties to the Westchester County Control System shall also be shown.(6)Boundaries of the property; building or setback lines, and proposed buildings when required by the Board; lines of streets, lots, reservations, easements and lands to be dedicated to public use; lengths and bearings of all straight lines; radii, lengths, central angles, tangent distances and radial bearings of all curves. All lengths shall be in feet and decimals of a foot, and all angles shall be given to the nearest tenth of a second unless otherwise specified by the City Engineer. No error of closure shall be acceptable.(7)Area of each lot in square feet.(8)Location of all permanent monuments, as specified by the City Engineer. Monument lines shall have a closure error of not more than 1:10,000.(9)Proposed street names.(10)Designation, purpose and area in square feet of all lands to be dedicated or reserved for public use.(11)Notation of dedication to the City of all streets, public sites or open spaces shown on the plat.B.Deeds of cession of streets, rights-of-way, easements and any land for public use; copies of agreements, covenants or other documents showing the manner in which areas to be reserved for the common use of the residents of the subdivision are to be maintained, all certified as to their legal sufficiency by the Director of Law.C.Planting plans showing types and location of street trees.